STRUCTURE |
R.C.C framed Structure. Outer 6" Brick Wall Inner 4.5 Brick Wall |
PLASTER |
12mm thick smooth plain plaster finish Double coat cement plaster & architectural finish in exterior. |
DOORS & WINDOWS |
Main Door - Bajaj secure front doors. Other door - Flush type with R.C.C. branded frames to all rooms and toilets Window - Powder coated aluminum sliding windows with M.S. grill |
FLOORING |
Ivory base vitrified tiles flooring to all rooms and balcony Common passage and staire case stone flooring |
KITCHEN |
Black granite top on cudapah with S.S. sink and glazed tiles upto lintel level. Glazed ceramic dado of 4' |
TOILETS |
Toilets - Anti skid tiles flooring Dado - Glazed tiles upto 7' height Branded sanitary wares and plumbing accessories in toilet Hot and cold tap arrangement and point for geyser. |
ELECTRICAL |
PVC conduit concealed copper wiring with adequate light, fan and socket outlets in each room Adequate power points in kitchen for microwave, Toaster, Aquaguard, Mixer, Fridge etc. with on power point for water heater in each bathroom A.C. point in master bedroom Modular switches of standard make Common lighting will be provided. |
TV & TELEPHONE |
Concealed cable and telephone wiring in drawing and bed rooms. |
PLUMBING/SANITARY |
Branded C.P. fitting All sewer line in PVC pipes All water supply lines in CPVC or PPR pipes Branded sanitary wares in white/grey/ivory colour |
WATER SUPPLY |
24 hours water supply from over head tank Provision of sump for collection of corporation water Bore well for utility water Two pump sets, one each for sump and bore well |
PAINTS |
Acrulic emulsions for the interiors. Acrylic exterior paint for the exteriors |
PARKING |
Allotted covered parking will be provided. |
ATTRACTIVE FEATURES |
Quality construction and no pollution area Compound wall and all flats designed as per vastu shastra Entrance - Two entrance gates. |
EXTRA CHARGES |
M.S.E.B. Meter deposit, transformer deposit, water meter charges.
Deposits and expenses at actual to be paid extra.
Registration charges, stamp duty, paging charges, documentation charges, to be paid extra.
Changes in specification and plan will cost extra and extra cost for the extra work.
Elevation changes not allowed.
Possession of the flat should be given by the builder after clearance of all dues.
Service Tax & other taxes as per Govt. rules. |