STRUCTURE |
R.C.C. frame structure. |
BRICKS WORK |
External Wall 230mm and Internal wall 115mm thick. |
LIFT |
5 Passenger with collapsible doors . |
FLOORING |
24"*24" Vitrified tiles flooring in all rooms, Kota stone in passage and stairs. |
DOORS |
Bajaj 'B' Secure Main Door and Remaining doors flush doors with RCC Frame. |
WINDOWS |
MS Window grill with 2 track Aluminium Sliding Windows. |
KITCHEN |
Granite Top Kitchen Platform with stainless steel sink and dado upto lintel level. Provision of exhaust fan, water purifier unit. |
TOILET |
Glazed tiles upto 7' in bathroom with anti skid ceramic flooring. |
PLUMBING |
All fitting will be concealed with necessary tap fittings.
|
PAINTING |
OBD With Putty finish in all rooms and outer wall with water proof cement paints. |
ELECTRIFICATION |
Concealed electric fittings with modular switches and ISI mark wiring. TV / Telephone / AC Points. |
EXTRA CHARGES |
M.S.E.B. Meter deposit, transformer deposit, water meter charges.
Deposits and expenses at actual to be paid extra.
Registration charges, stamp duty, paging charges, documentation charges, to be paid extra.
Changes in specification and plan will cost extra and extra cost for the extra work.
Elevation changes not allowed.
Possession of the flat should be given by the builder after clearance of all dues.
Service Tax & other taxes as per Govt. rules. |